Project Timeline

Phase I

  • Create a stone/granite planter around the existing Grange Hall/Town Hall message sign
  • Determine bounds/markers for land owned by Town in area of work
  • Talk with abutting property owner on West side as to SW marker and clearing "green space".
  • Clean out "green space" area on West side
  • Discuss phases of work with Heidi Marshall, Consulting Engineer
  • Dialog with DOT

Phase II

  • Continue dialog with Heidi Marshall and Dist. 5 (DOT)
  • Obtain a "plan" from Heidi with conceptual sketches
  • Have material to hand out, conceptual drawings for town meeting in March, 2016

Phase III

  • Improve Memorial Park
  • Install curbing around Park
  • Update landscaping to included a Christmas tree Improve Parking lot area
  • Replace existing stairs between upper and lower parking areas
  • Install appropriate lighting for safety and aesthetics Landscape West and South sides of parking lot Crosswalk
  • Provide a "paved" walkway on the North and South sides of Main Street with length to be determined by DOT and consulting engIneer
  • Provide a pedestrian crosswalk to be determined by DOT and consulting engineer
  • Create a grass/landscaped barrier "island" on South side with fencing/granite posts

Phase IV

  • Repave complete parking lot and line all the parking spaces
  • Any additional markings for handicapped parking, in/out directionals, etc.
  • PLEASE NOTE THAT THE WORK UNDER EACH PHASE IS SUBJECT TO CHANGE, ADDITIONS, SUBTRACTIONS AND MOVEMENT AS TALKS WITH THE CONSULTING ENGINEER AND DOT CONTINUE.
  • ENTRANCE and EXIT POINTS FOR THE PARKING LOT ARE STILL UNDER DISCUSSION AND CONSIDERATION AT THIS POINT.

Phase V

  • Construction of gazebo in SW corner plantings of flowers/flower boxes

Revised draft Dec. 2015